Robert W. Hite Treatment Facility Projects

10-Inch Potable Water Main Replacement
PHASE: DESIGN/BUILD
ESTIMATED TOTAL PROJECT COST: $1.9 MILLION

Sodium Bisulfite Static Mixer Access
PHASE: Design/build
ESTIMATED TOTAL PROJECT COST: $1.8 MILLION

Electric Transformer Replacement
PHASE: Design
ESTIMATED TOTAL PROJECT COST: $3.9 MILLION

Electrical Transmission Service Substation
PHASE: Study
ESTIMATED TOTAL PROJECT COST: $13.8 MILLION

Nuisance Struvite and Dewaterability
PHASE: Study
ESTIMATED TOTAL PROJECT COST: $24.3 MILLION

Interceptor Projects

Transmission System Modeling Support and Permanent Flow Monitoring
PHASE: Design/construction
ESTIMATED TOTAL PROJECT COST: $3.9 MILLION

Condition Assessment of Siphon and Force Mains
PHASE: Study
ESTIMATED TOTAL PROJECT COST: $1.2 MILLION

Interceptor Rehabilitation 2015
PHASE: In-house design (no outside cost)/construction
ESTIMATED TOTAL PROJECT COST: $7.0 MILLION

Interceptor Rehabilitation 2016
PHASE: In-house design (no outside cost)/bidding
ESTIMATED TOTAL PROJECT COST: $6.5 MILLION

Delgany Interceptor System Diversion Structure Improvements
PHASE: Preliminary design
ESTIMATED TOTAL PROJECT COST: $3.2 MILLION

Lift Station Short-Term Fixed Asset Replacement – Phase II
PHASE: In-house design (no outside cost)/construction
ESTIMATED TOTAL PROJECT COST: $1.6 MILLION

Transmission System Air Flow and Odor Control Study
PHASE: Study
ESTIMATED TOTAL PROJECT COST: $1.3 MILLION

Sand Creek/Second Creek Regional Master Plan
PHASE: Study
ESTIMATED TOTAL PROJECT COST: $0.5 MILLION

Transmission System Structure Rehabilitation
PHASE: Construction
ESTIMATED TOTAL PROJECT COST: $0.8 MILLION

River Projects

Aquatic Life Habitat Improvements – Phase IV
PHASE: Design
ESTIMATED TOTAL PROJECT COST: $1.5 MILLION

Segment 15 Temperature Mitigation and Alternative Analysis
PHASE: Study
ESTIMATED TOTAL PROJECT COST: $0.6 MILLION